Determination of rated power for IEPCs for MRF and CIF
Summary
- For MRF (point 1.14.3) and CIF (1.2.15) the rated power of IEPC shall be calculated. Based on the discussions with stakeholders this shall be done based on the input data on full-load curve (and not on any R85 figures).
- Additionally MRF (point 1.14.4) and CIF point 1.2.16 shall be checked whether they are calculated correctly for IEPC.
- For wheel hub IEPCs it shall be checked if the multiplier (1 or 2) is considered correctly
Component(s) involved
Decl mode
Versions affected:
- VECTO versions(s): 4.x