Code development platform for open source projects from the European Union institutions :large_blue_circle: EU Login authentication by SMS has been phased out. To see alternatives please check here

Skip to content
Snippets Groups Projects

Repository graph

You can move around the graph by using the arrow keys.
Select Git revision
  • 9ab8ce85f9e43366aeb83ebd035ac1d728ff56ab
  • stable default
  • HEV-timeruns-dev
  • IEPC-experiments
  • amdm2/develop
  • amdm2/main
  • amdm3/develop
  • amdm3/main
  • aptngearbox-not-auto
  • issue-1039
  • issue-templates
  • official/develop
  • official/main
  • pdf-reports
  • playground
  • powertrains-multiple-axles
  • test/nuget_publish
  • timerun-empower-hybrids
  • timerun-pwheel-hybrids
  • Release/v5.0.3
  • Release/v5.0.1
  • Release/5.0.0-RC
  • Nuget/v0.11.4-DEV
  • Release/v0.11.4-DEV
  • Release/4.3.4-DEV
  • Release/4.3.3
  • Release/4.3.2-RC
  • Release/v4.3.0-DEV
  • Release/4.2.7
  • XMLConverterTool/4.2.6.0
  • Release/4.2.6-RC
  • Release/v4.2.5
  • Release/v4.2.3
  • Release/v4.2.2.3539-RC
  • Release/v4.2.1.3469
  • Release/v0.11.2.3456-DEV
  • Release/v4.2.0.3448-RC
  • Release/v4.1.3.3415
  • Release/v4.1.1.3413
39 results
Created with Raphaël 2.2.028Jan262521201918141312118717Dec161514111087432130Nov262524171612119876543228Oct272120191817161513127652130Sep2928252423222118171615141110987432131Aug2826242019171413121110WIP - Auxillary should have been spelt Auxiliary WIP - M13 Added to Harness UI WIP- M13 Completed With Unit Tests - Issues Arising - See communication log today to Mike Preston and John Norris WIP Completed M11 + Unit Tests WIP - Module 10 Complete, Tested and Integrated in Harness. WIP WIP WIP. Changes to M9 and M4 regarding Unit Rates to get Flow per second and FC per second in M9 ( grams ) WIP WIP - M9 Completed including tests also integrated into Harness UI. Now need to validate that the live modules in the auxEnvironment are providing values which are properly reflected in the outputs of M9. Work In Progress Checkin Module8-Complete m6 and m7 Unit Tests Written and Debugged Modules, all tests pass. Now need to integrate m6 and m7 into Harness and Bind additional signals to Harness UI for testing Before Refactoring CycleTime and VehicleMass => Signals M6 and M7 Written, now looking at unit tests for them. WIP Checkpoint Pending FInal Checks By Mike, Ready to proceed to Upper Modules 6 and above. Before Refactoring BI Linear Interpolation Now beginning Validating Pnumatics Calculations. Compressor values changed from KW to Watts Checking Values On Playground Tab. Possible Inconsistancies on Smart Result Cards ? M0 to M5 are on the Harness and testing out OK except for Extrapolation or Limiting issues. Before M4 refactor for Signals Inclusions ( NO RPM) Before M2 Refactor Puplic Methods to remove RPM M1 tests rewritten, signals wired to text boxes Dashboard - Electricals Complete, Pneumatics Complete, HVAC SSM OutputValues Complete. Now need to work on 1. File Browsing and Persistance. Refactor of Pneumatics Part1 ( Manual ) now wire up to boxes through intermediary handler. Then do the same for electrics ( PS Finihs the few User inputs left. Electrical and Pneumatics Validation Almost Complete - Checkpoin saftery checkin Added Result Card Context Menu for deletion of rows. ResultCards changed to List(Of Smart Result) Also new tests written to ensure unsorted lists give the correct result. Electrical Consumables Binding and Validation Now Operational. ElectricalConsumerListChangedToListFrom DIC, all tests pass. Updates Before Changing ElectricalConsumer list to List from Dictionary Creating TestHarnessToTest the model with environment. Work in progress. Signals Refactored Into M05,M1,M4,M5 Pre-SignalsRefactoring Before RPM Refactor Removed dependency in ElectricalConsumerList from having to supply DoorDutyCycle. This must be inserted during construction as is depended on Cycle Actuations and does not have to be recalculated unless the cycle changes. Module05Started Electrical Consumer Tests Fixed Module2 Completed With Tests
Loading